AI-generated lifestyle visualization of the KD001-A3 upholstered adjustable bed frame in a neutral showroom
AI-generated lifestyle visualization based on the catalogue product reference. Confirm finish and configuration against the current model specification.
KD001-A3 upholstered adjustable bed frame
Catalogue product view. Upholstery, size and configuration may vary by project.
BED FRAMES · OEM / ODM

KD001-A3 Upholstered Adjustable Bed Frame

An upholstered adjustable bed frame with independent head and leg lift, available in Twin through King for OEM and private-label programs.

  • Backrest adjusts 0–60°; footrest adjusts 0–40°
  • Separate lifting system and mattress design for compact packing
  • Steel-frame construction; request the current model-specific cycle-test record
  • Upholstery options: high-density sponge; 15/18 mm eco board or honeycomb aluminium panels
  • Available Twin / Full / Double / Queen / King
Request specs & quote ↗
ModelKD001-A3
CategoryBed frames
Technical specificationAvailable on request
Project reviewOptions confirmed for your market

Dimensions, motion functions, materials, controls and compliance documents are confirmed against the current model revision before order approval.

BUYER REVIEW CHECKLIST

Confirm the current KD001-A3 specification

Website copy describes the product direction, not a universal engineering promise. Ask for the latest model-specific sheet and make the following items part of the approved quotation or sample record.

01

Platform and size

Confirm the required size, deck format and compatible mattress.

02

Motion and controls

List the required adjustment functions, presets and control format.

03

Finish and integration

Define upholstery, surrounding furniture and installation constraints.

04

Packing and evidence

Request current carton data, assembly instructions and applicable model documents.

What to include in your inquiry

Name the model, destination country, sales channel, required size and functions, expected quantity, branding needs and packaging constraints. KCAI will confirm which options and documents apply to the current revision before order approval.

SAME PRODUCT FAMILY

Related models

Compare other published models in this family before requesting a model sheet.

GUIDES FOR THIS MODEL

Read before you specify KD001-A3.

↗

Twin to King: Adjustable Bed Size Customization Guide for Buyers

A procurement guide to adjustable bed sizes: catalog frame and mattress dimensions, a US-versus-EU size-name map used only as an approximate market reference, and a size-matrix method that keeps SKU counts under control.

↗

Why Does an Adjustable Bed Motor Stop After Repeated Adjustments?

A method for separating an adjustable-bed motor pause from power, control and mechanical faults, with a reproducible OEM sample record.

↗

Fixed-Structure vs Knock-Down Adjustable Bed Frames: Buyer Guide

Compare fixed-structure and knock-down adjustable bed frames by complete carton set, destination assembly, service parts and revision-controlled evidence.

↗

Why Does a Mattress Slide on an Adjustable Bed Base?

A buyer method for identifying mattress movement, comparing retention interfaces and recording a paired mattress-and-base sample inspection.

↗

Adjustable Bed Base Wholesale Buying Guide: Specifications, Product Tiers and Supplier Questions

A wholesale buyer's framework for comparing adjustable bed bases by platform, configuration, evidence, packaging and total landed-cost inputs before requesting quotes.

↗

Adjustable Bed Motor and Lifting Capacity: How Buyers Should Compare Systems

An engineering-focused buyer guide explaining why actuator force is not the same as bed load rating and how to compare geometry, load path, speed, duty cycle, controls and full-system validation.

↗

Adjustable Bed Power Supply and Plug Localization Guide

A buyer checklist for aligning adjustable bed input power, adapters, plugs, cords, control components, labels and evidence with a destination-market program.

↗

Adjustable Bed Cable Routing and Pinch-Point Review Guide

A practical OEM sample-review method for adjustable bed wire harness routing, connector retention, strain relief, service access and full-motion pinch-point checks.

↗

Adjustable Bed Assembly Torque Specification: A Buyer Review Guide

How OEM buyers can review fastener locations, torque controls, tools and inspection evidence before approving an adjustable bed for repeatable field assembly.

↗

KD001-A3 Adjustable Bed Frame Specification Guide

Align the KD001-A3 frame version, size, sample and packing record before approving an OEM or wholesale order.

↗

Carbon Steel vs Aluminum Adjustable Bed Frames: OEM Buyer Guide

Compare carbon steel and aluminum adjustable bed frame construction by strength, mass, joints, corrosion control, cost and validation evidence before approving an OEM design.

↗

7 Adjustable Bed Installation Errors That Drive Returns

A B2B installation and handover checklist covering seven adjustable-bed setup errors that can become avoidable support cases or returns.

↗

Adjustable Bed Total Cost of Ownership for B2B Buyers

A calculation framework for comparing adjustable bed purchase price, logistics, installation, returns, service parts and warranty exposure.

↗

Adjustable Bed Motor Noise and Vibration: A Buyer's Evaluation Guide

Compare adjustable bed noise during sample review using a consistent setup and supplier handoff.

↗

Hotel and Hospitality Adjustable Bed Procurement: A B2B Sourcing Guide

A hotel buyer's evidence-based checklist for room fit, cleaning, electrical scope, sample validation, installation and after-sales planning.

↗

Upholstered vs Open-Frame Adjustable Bed Bases for Private-Label Brands

A sourcing comparison of upholstered and open-frame adjustable bed bases for private-label ranges, covering appearance, integration, packaging, quality control and service.

↗

What Problems Do Adjustable Beds Solve for Furniture Buyers?

A claim-safe B2B guide to the practical comfort, product-integration and sourcing problems an adjustable bed can solve—and the limits buyers must specify.

↗

Adjustable Bed Upholstery Specification Guide for OEM Buyers

A buyer-focused guide to specifying upholstery, headboards, seams, motion clearance, controls, packaging and approval evidence for private-label adjustable beds.

MADE FOR YOUR PROGRAM

Talk through the details.

Request the current specification sheet, available options and documentation for your target market.

Request KD001-A3 specifications ↗