Smart beds

Smart Bed OEM & ODM Manufacturer

Compare KR smart-bed product references for a branded program, then request the current configuration, control scope and destination-market documentation for the model you choose.

PUBLISHED MODELS

Compare the published smart bed models.

Each model page shows the information currently published. Request the model sheet to confirm the revision, options and documents for your destination market.

BUYER GUIDES

Smart bed OEM and ODM guides

Compare suppliers, validation gates and private-label cost drivers before sampling.

How to compare smart bed OEM/ODM suppliers

A technical due-diligence matrix for smart bed OEM and ODM suppliers.

Read the guide ↗

Smart bed ODM validation gates

The checks to pass before a smart bed ODM design moves to production.

Read the guide ↗

Private label smart bed cost and MOQ guide

What shapes a private-label smart bed quotation and minimum order.

Read the guide ↗

Sleepace smart sleep system buyer's guide

What to verify before offering a Sleepace-controlled smart bed.

Read the guide ↗

Smart-home adjustable bed integration

How to verify app, voice and smart-home claims with a supplier.

Read the guide ↗
Smart beds

Choose a Smart-Bed Product Reference

KCAI publishes KR001 through KR004 as smart-bed product references. Compare the product pages first; the quoted frame, mattress, controls and options must then be confirmed as one configuration.

KR001 upholstered smart bed · KR002 AI smart bed · KR003 compact smart bed · KR004 AI smart bed

Smart beds

Control System

Control-system requirements, including connected features, are assessed for the selected model and destination market before quotation.

Smart beds

Smart Sleep and Motion Features

Feature availability must be documented for the selected model before order. Request a model-specific specification sheet.

Smart beds

Certifications and Compliance

Request model-specific compliance documentation for your destination market. No certification scope is represented without the supporting document.

Smart beds

OEM and ODM for Smart Bed Brands

Send the destination market, channel, preferred KR model, size, required functions, branding and packaging requirements. KCAI can review a platform-led ODM or buyer-led OEM scope against the selected configuration before quotation.

Review OEM and ODM services · Plan a private-label program · Smart-bed supplier evidence checklist

FAQ

Frequently asked questions

Do all KR smart beds support app control?

Control options depend on the selected model. Request the current documented configuration.

Can a private-label smart-bed project include app branding?

Share your control and branding requirements so feasibility can be reviewed for the selected model.

What mattress types are available?

Available mattress constructions are confirmed with the selected model specification.

Are smart features verified before shipping?

Ask for the applicable model documentation and agreed inspection requirements before shipment.

Smart beds

Request a Smart-Bed Review

Request a Smart-Bed Review ↗
RETAIL CONFIGURATION

Compare king and split-king programs

Review motion setup, assortment complexity, packaging and buyer requirements before selecting a retail configuration.

Read the king vs split-king guide
SMART BED BUYER GUIDES

Plan the feature and product range

Review feature expectations, product-line choices and return-prevention questions before selecting a model.

Zero-gravity feature guide

Understand how to document preset behavior and model-specific feature requirements.

Read the feature guide

Build a smart-bed product line

Organize assortment, controls, configuration and buyer decisions across a product range.

Plan the product line