ELECTRIC BED FRAME · OEM / ODM

KD001-A6 Smart Bed Frame with Side Jacket

A smart adjustable bed frame with a side-jacket design and optional aluminium-plate variant, suited for premium bedroom collections.

  • Backrest adjusts 0–60°; footrest adjusts 0–45°
  • Side-jacket and aluminium-plate configuration options
  • Compatible with wired/wireless remote and voice control
  • Optional German OKIN motor for quiet, smooth operation
  • Available Twin / Full / Double / Queen / King
Request specs & quote ↗
ModelKD001-A6
CategoryElectric Bed Frame
Technical specificationAvailable on request
Project reviewOptions confirmed for your market

Dimensions, motion functions, materials, controls and compliance documents are confirmed against the current model revision before order approval.

BUYER REVIEW CHECKLIST

Confirm the current KD001-A6 specification

Website copy describes the product direction, not a universal engineering promise. Ask for the latest model-specific sheet and make the following items part of the approved quotation or sample record.

01

Platform and size

Confirm the required size, deck format and compatible mattress.

02

Motion and controls

List the required adjustment functions, presets and control format.

03

Finish and integration

Define upholstery, surrounding furniture and installation constraints.

04

Packing and evidence

Request current carton data, assembly instructions and applicable model documents.

What to include in your inquiry

Name the model, destination country, sales channel, required size and functions, expected quantity, branding needs and packaging constraints. KCAI will confirm which options and documents apply to the current revision before order approval.

MADE FOR YOUR PROGRAM

Talk through the details.

Request the current specification sheet, available options and documentation for your target market.

Request KD001-A6 specifications ↗