CONTROL SYSTEM

Adjustable Bed Controls & Accessories

Discuss wired, wireless or connected-control requirements with the selected model and destination market in mind.

CONTROL SYSTEM

Three control tiers

Current control options are confirmed for the selected model before quotation.

Standard

Wired remote

Discuss wired-control requirements for the selected model and market.

Core

Wireless remote

Request currently available wireless-control options for the selected model.

Premium

Connected control

Discuss connected-control requirements and compliance needs before product selection.

CONTROL SYSTEM

What you can customize

Requirements to discuss before product selection.

  • Remote and control-interface requirements
  • Branding requirements where technically feasible
  • Required motion presets and accessibility needs
  • Voltage, plug and radio-compliance requirements for the destination market
CONTROL BUYER GUIDES

Compare control options and system fit

Use these checklists to define remote requirements and confirm compatible components for a specific model.

Remote control options

Compare control approaches and record the functions your sales channel requires.

Review remote options
FAQ

Frequently asked questions

Can I request branded controls?

Share your branding and control requirements so feasibility can be reviewed for the selected model.

Does wireless control need certification?

Wireless remotes can trigger radio compliance requirements in some markets. Confirm this with us before committing to a wireless SKU.

What control options are available?

Control options depend on the selected model and destination market. Request the current documented configuration.

CONTROL SYSTEM

Spec your control system

Talk to an engineer ↗