Adjustable bed factory
in Dongguan since 2004.
KCAI builds adjustable bed frames, smart beds and leisure chairs for OEM and ODM programs in a 25,000 sqm factory in Dongguan, Guangdong.
One factory,
from frame to finish.
- Founded
- 2004
- Factory area
- 25,000 sqm
- Employees
- 150
- Adjustable-bed focus
- Since 2012
Production capacity, lead time and inspection scope are confirmed for the selected model and order rather than published as site-wide figures.
- Model-specific production information on request
- Available quality and inspection documentation on request
- Packing requirements reviewed for the order plan

Every stage,
planned by project.
The production and inspection plan is confirmed for the model and order requirements.
- Model and requirement review
- Approved material and component confirmation
- Production and inspection plan confirmation
- Packing and shipping requirement review
From metalwork
to final assembly.
This short workshop video shows selected production activities recorded at KCAI: metal cutting and preparation, frame grinding, adjustable-base assembly, and upholstery work.
The footage documents manufacturing activity. Model-specific capacity, inspection criteria and compliance documents should still be confirmed for each project.
Inside the
production floor.
Recent photographs from KCAI's Dongguan workshop show actual production activity. Request current project evidence before relying on a model-specific process claim.





Made for
global markets.
Request model-specific quality, packing and destination-market documentation before order.
Product families
Each family page lists the published models and the details to confirm before sampling.
Adjustable mattresses
View models ↗Smart adjustable beds
View models ↗Smart recliners
View models ↗Home care beds
View models ↗Slatted bed bases
View models ↗Prepare for a focused factory review
Use model-specific questions and evidence when evaluating a manufacturing partner.
Audit an adjustable-bed factory
Prepare a structured review of production, traceability, inspection and open questions.
Read the factory audit guideFrame strength and load testing
Compare test scope, conditions and evidence tied to the selected product configuration.
Review the testing guideSample approval checklist
Record the approved sample, criteria, configuration and change-control expectations.
Read the approval checklistCertification planning by market
List destination-market requirements and verify which documents apply to the selected model.
Review the market guideCommon questions
about manufacturing.
Where is the KCAI factory and how large is it?
KCAI was founded in 2004 and operates a 25,000 sqm factory with 150 employees in Shatian Town, Dongguan, Guangdong, China. Production capacity and lead time are confirmed for each model and order.
Can I request manufacturing information?
Yes. Share the model and target market so the team can provide the current available documentation.
Can I arrange a visit?
Contact the team to discuss whether a visit or remote review is available for your project.
Continue your supplier review
Each page answers one sourcing question. When the brief is ready, send it through the quote form.
Schedule a tour or virtual walkthrough.
Contact us to discuss an on-site visit or a remote workshop review.