Quality control

Quality Control for Your Adjustable Bed Order

Inspection scope is agreed for the selected model and order before production starts, and checked against the approved sample. Request the documentation available for your model before commitment.

Quality control

Inspection Requirements

The applicable inspection scope depends on the model, order and destination-market requirements.

  • Approved model specification
  • Order-specific inspection criteria
  • Available test and compliance documents
  • Packing and shipment requirements
Quality control

Items to Include in the Inspection Plan

List the checks in the order documents so both teams inspect against the same approved sample and specification.

  • Dimensions, finish and upholstery against the approved sample
  • Lift and function check of motors, remote and optional functions
  • Labels, manuals and plug type for the destination market
  • Carton marks, packing method and quantity per container

Sample approval checklist · Frame strength and load testing guide

Quality control

Technical Evidence

Do not rely on generic load, durability or actuator claims. Request the evidence applicable to the exact model and configuration.

Quality control

Order Documentation

Commercial terms, warranty scope and after-sales responsibilities should be written into the quotation and order documentation.

Quality control

Compliance

Request model-specific documents for the destination market. A standard or category name is not a certificate.

If you plan a third-party inspection, include its scope and timing in the order documents.

Certifications and patents

Quality control

Related Pages

Review the factory, the OEM checkpoints and packing before you send the brief.

Product range · OEM process · Custom development · Factory · Packaging & logistics · Buyer FAQ

FAQ

Frequently asked questions

Do you perform pre-shipment inspection?

Share the order and destination requirements so the available inspection scope can be confirmed.

Can I request a QC report?

Contact the team with the model and order context to request available quality documentation.

Are motors tested in-house?

Request the current technical evidence for the exact actuator and frame configuration you are evaluating.

Quality control

Request QC Report

Request QC Report ↗