On this page
When a model code appears on a drawing, quotation and carton, a buyer should be able to trace all three to the same product revision. That is the central task when evaluating the KD001-A3 adjustable bed frame: the available records describe more than one structure under the code. Treat the code as the start of the comparison, then identify the version actually being offered.

AI-generated editorial scene based on a catalogue reference. It does not represent a particular shipment or establish a fixed or folding configuration.
Start with model, revision and structure
The parameter summary describes a fixed configuration; a separate shipment record explicitly labelled KD001-A3 describes a folding configuration. The records do not establish whether these names represent two revisions, two customer configurations or another naming difference. Put the structure description and drawing reference on the quotation before approving a sample.
Request the supplied parts as individual lines: frame, lifting assembly, legs, controls, power supply, mattress and hardware. Then identify who approves any change to the drawing or parts list. This makes a later reorder easier to compare with the original sample.
Compare the parameter reference and the labelled batch
The parameter summary and a separate SKU-labelled shipment describe different configurations. Match the model, structure and revision before using a dimension or packing value in an order.
| Question | Parameter summary | Shipment record |
|---|---|---|
| Structure wording | Fixed | Folding |
| Intended use | Starting point for the current drawing | Evidence for that specific shipment |
| Buyer action | Match the offered version and datum | Match the batch to the current order before reuse |
Keep shipping data attached to its batch
For freight planning, request the carton size, weight, number of cartons per set and packing materials for the exact ordered version. A batch record is not a universal specification for every size or structure. A container estimate can support an initial comparison, but the actual loading plan and order-specific packing list determine the shipped arrangement.
Approve the sample against the order record
Use the quotation, drawing, parts list and sample side by side. Photograph the model label and overall structure; measure the assembled frame from the datum stated in the drawing; and list the components and controls actually supplied. With the intended mattress, observe movement and check for contact with surrounding furniture. Record any open issues against an owner and target resolution date.
The KD010-A2 and KD011-A3 provide other frame references. Compare quoted assemblies rather than assuming a particular model is always fixed, faster to assemble or cheaper to ship.
For a comparison across product tiers and order requirements, see the wholesale adjustable-base buying guide. Use this model page to resolve the KD001-A3 version first; use the wholesale guide to compare the wider assortment.
Build a reorder reference that can be reused
| Field | Approved record |
|---|---|
| Model and structure description | ______ |
| Drawing and revision | ______ |
| Size and measurement datum | ______ |
| Parts, controls and motor identifiers | ______ |
| Approved sample identifier | ______ |
| Carton, units per set and batch reference | ______ |
| Open changes and approval owner | ______ |
Keep this crosswalk with the purchase order. On a repeat order, record what has changed instead of relying only on “same as last order.”
Request the KD001-A3 specification for your required version.