Private label

Private-Label Adjustable Beds & Smart Beds

Start from a named adjustable-base or smart-bed platform. Confirm which branding, control, finish and packaging changes are feasible for the selected model and destination market.

Private label

Branding and Configuration to Review

Share the buyer-facing requirements for the selected model. Feasibility, available options and supporting documents are confirmed before they are included in a quotation.

  • Logo placement and artwork for applicable product surfaces
  • Remote or control-interface branding where supported by the selected model
  • App branding only when available for the selected smart-bed configuration
  • Upholstery, finish and packaging artwork for model-specific review
Private label

Private-Label Smart Bed Scope

A complete smart bed may combine a frame, motion mattress and control system. Name the intended combination before requesting brand or app changes; availability and responsibilities are confirmed for the actual model revision.

Compare KR smart-bed references · Prepare a smart-bed specification brief

Private label

How to Prepare the Private-Label Brief

Start with the closest available platform, then record which details are fixed and which still need a feasibility review.

  • Name the model or product category and destination market.
  • List requested brand assets, controls, finishes, sizes and package changes.
  • Confirm feasibility, minimum order, cost and timing in the written quotation.

Adjustable bed base ODM: what it includes and how it differs from OEM

Private label

Private-Label Options by Product Family

Each program starts from a published KCAI model. The options below are the ones shown on the product pages; feasibility for your configuration is confirmed in the quotation.

  • Adjustable bed frames: Twin to King catalogue sizes, optional German OKIN or Haojiang motor, wired or wireless remote
  • Smart beds: upholstered frame, motion mattress and control system, with app and voice control on selected models
  • Motion mattresses: integrated mattress-and-lift models such as KD004-B1
  • Leisure chairs: tech-leather and top-grain leather versions in the catalogue

Adjustable bed frames · Smart beds · Motion mattresses · Leisure chairs

Private label

Private Label Smart Bed: Decisions to Make First

A private-label smart bed brings a frame, a mattress and a control system together under one brand. Decide these points before requesting a quotation so the reply can be specific.

  • Which frame and mattress combination carries your brand
  • Which control route the end user sees: remote, app or both
  • Whether the remote, app and packaging show your brand or a neutral design
  • Which destination-market documents your retailers require
  • Who handles spare parts and after-sales support for each component
Private label

Guides for Private-Label Buyers

These buyer guides go deeper on private-label cost, customization and supplier comparison.

Private label adjustable bed customization checklist · Private label smart bed cost and MOQ guide · How to compare smart bed OEM/ODM suppliers · Adjustable bed base ODM vs OEM

Private label

Sampling and Approval

Agree the sample scope, fees, timing and acceptance checks before sampling begins. Record the approved model revision, configuration and artwork as project references before production.

Private label

Before the First Order

Keep the commercial and product decisions together so both teams can check the same agreed version.

  • Approved model specification and configuration
  • Brand artwork and packaging revision
  • Inspection scope and sample approval record
  • Destination-market documents and written commercial terms
FAQ

Frequently asked questions

Can you make a private label smart bed?

Projects start from a KCAI smart-bed platform. Branding, control and packaging changes are confirmed for the selected model in writing before sampling.

Can I brand the remote or app?

It depends on the selected model, control system and destination market. Share the requirement so the available options can be confirmed in writing.

Is a pre-production sample included?

Sampling availability, scope, timing and fees depend on the project. Confirm them in the quotation before work begins.

What is the minimum order quantity?

MOQ depends on the model and customization scope and is confirmed in the quotation.

Private label

Review Your Program

Review Your Program ↗