Size
Catalogue models are listed in Twin, Full, Double, Queen and King sizes. Other dimensions are reviewed for the selected model before quotation.
Start from the closest KCAI catalogue platform, list the changes your market needs, and confirm feasibility, sampling and production terms for that model before committing.
Feasibility is confirmed for the selected model. MOQ, sample and production timing for each option are stated in the written quotation.
Catalogue models are listed in Twin, Full, Double, Queen and King sizes. Other dimensions are reviewed for the selected model before quotation.
An optional German OKIN or Haojiang motor can be specified on applicable catalogue models.
Wired or wireless remote control, with app and voice options on selected models.
Fabric and finish requests are reviewed against the selected model.
Logo placement, labels and packaging artwork are confirmed for the model and destination market.
Functions such as massage, under-bed lighting or USB charging depend on the model. Confirm the configuration in the quotation.
A development request is reviewed against an existing KCAI platform first. Changes are listed one by one so feasibility, cost and timing can be confirmed for each.
The project follows the same checkpoints as an OEM order: requirement review, quotation, sampling, approval, order release, inspection and shipping.
See the seven OEM checkpoints · Adjustable bed base ODM guide: platform route or buyer specification
Read these before listing size, feature or motor changes in a development brief.
Adjustable bed size customization guide · Which adjustable bed features add value · Motor duty cycle and thermal protection
Sample scope, acceptance checks, timing and fees are agreed in writing before sampling. Production starts from the approved sample revision.
Order quantity, inspection scope, packaging and shipping documents are confirmed for the approved configuration before release.
Product range · OEM process · Factory · Quality control · Packaging & logistics · Buyer FAQ
Share the concept, target market and quantity. The team first checks which KCAI platform is closest and which changes are feasible for that model.
Development timing depends on complexity and is confirmed in the project plan.
Sample scope, fee and timing are confirmed in writing for the selected configuration before sampling starts.