PACKAGING & LOGISTICS

Adjustable Bed Packaging & Logistics

Packaging decides both your landed cost and your damage rate. We match packaging to your lane — retail pallet, e-commerce parcel, or mixed container.

PACKAGING & LOGISTICS

Match packaging to the lane

Each shipping lane has a different risk profile, so packaging is matched before production.

Retail

Bulk carton on pallet

Protection on the pallet — for showroom and in-store delivery.

E-commerce

Flat-pack or foldable, retail box

Doorstep damage and unboxing are the key concern for parcel lanes.

Mixed container

Mixed cartons, tight loading

Cube and load optimization across frames, smart beds and recliners.

PACKAGING & LOGISTICS

Packaging decisions that affect cost and damage risk

Four ways the design and planning stage reduces landed cost.

  • Flat-pack disassemblable and foldable frame designs cut box dimensions.
  • Container cube is planned from accurate per-model carton dimensions.
  • Packaging is matched to your actual carrier lane before full production.
  • Incoterms and the shipping hand-off are documented in the quotation.
SHIPPING REVIEW

Prepare the details for a model-specific plan

Carton dimensions, handling limits and shipping terms must match the selected model, order mix and destination.

01

Product and carton data

Identify the model revision, units per carton, packed dimensions, packed weight and any documented stacking limits.

02

Destination and delivery channel

Share the destination, retail or parcel route, receiving constraints and applicable labeling or document requirements.

03

Order mix and shipping terms

List quantities by model and confirm the packing plan, shipping hand-off and terms in the written quotation.

FAQ

Frequently asked questions

How do I lower e-commerce freight?

Choose a flat-pack or foldable base — reducing box dimensions is the single biggest lever on parcel freight.

Can I mix different models in one container?

Yes — frames, smart beds, and recliners can share a container when the load is planned for weight and stacking.

What are your shipping terms?

Shipping terms are confirmed in the quotation, with packaging reviewed for your retail or e-commerce lane.

CONTAINER PLANNING

Plan the model mix before loading

Use the buyer guide to organize carton dimensions, model quantities, loading order and unresolved packing questions.

Read the mixed-model loading guideReview the shipping-damage checklist
NEXT STEPS

Continue your supplier review

Each page answers one sourcing question. When the brief is ready, send it through the quote form.

PACKAGING & LOGISTICS

Plan your shipping

Get shipping details ↗