Frequently asked
questions.
Quick answers for product buyers and OEM / ODM partners. Contact our team if your project needs a specific configuration.
Products
What products does Kang Cai manufacture?
The range includes adjustable bed frames, integrated smart beds, motion mattresses, home care beds, slatted bed bases and electric leisure chairs. Browse the product range.
Which sizes are available?
Catalogue adjustable bed models are listed in Twin, Full, Double, Queen and King sizes. Confirm the exact dimensions for the selected model and market before sampling. Adjustable bed frames.
Which motors and controls are used?
An optional German OKIN or Haojiang motor can be specified on applicable catalogue models. Wired or wireless remotes are available, with app and voice options on selected models. Smart beds.
OEM & ODM
Can you support OEM or ODM projects?
Yes. KCAI works as an OEM and ODM factory for adjustable beds and smart sleep products. Projects follow seven checkpoints from requirements to shipping. See the OEM process.
What can be customized?
Size, motor option, controls, upholstery and finish, branding and packaging, and optional functions such as massage or USB charging. Feasibility is confirmed for the selected model. Custom development.
Can I sell the beds under my own brand?
Private-label projects start from a named model. Logo placement, labels and packaging artwork are confirmed for that model and the destination market. Private label.
Orders & logistics
What is the minimum order quantity (MOQ)?
MOQ depends on the model and configuration and is stated in the written quotation. Include your estimated quantity per model in the inquiry so the reply can be specific. Request a quote.
How long do samples and production take?
Sample and production timing depend on the model, the changes requested and the order quantity. Both are confirmed in writing before sampling and before order release.
How are the beds packed and shipped?
Packing method, carton marks and container loading are agreed for each order, and trade terms are stated in the quotation. Mixed-model containers can be reviewed when the order is planned. Packaging & logistics.
Documents & quality
What certificates or compliance documents are available?
Selected product patent documents are shown on this website. Test reports and market compliance documents vary by model and destination; ask for the documents that apply to your model and market. Certifications and patents.
How is quality checked before shipment?
The inspection scope is agreed for each order and checked against the approved sample. A third-party inspection can be included in the order documents. Quality control.
Can I visit the factory?
Contact the team to discuss an on-site visit or a remote review of the Dongguan workshop. Factory.
Company & warranty
Where is Kang Cai located?
Kang Cai was founded in 2004 and is based in Shatian Town, Dongguan City, Guangdong Province, China, with a 25,000 sqm factory. About KCAI.
What warranty and after-sales support do you offer?
Warranty scope and spare-parts support are confirmed for the selected model in the quotation and order documents. Troubleshooting uneven lifting.
Published contact details: zhouhaobin454@gmail.com and +86 19065020180.