On this page
A buyer places a production run of adjustable bed bases in a size that looked right on a spreadsheet. The container arrives, the retailer sets a frame under the mattress it was meant to match, and the base overhangs or stops short. The shipment cannot be sold as a matched set. What remains is dead stock, a refused delivery, and freight spent on product that does not fit the range.
Size is the specification that cannot be corrected after production. A motor brand can be locked on the sample, a fabric can be changed, and a remote can be reprogrammed, but a frame built at the wrong width stays that width. This guide sets out catalog dimensions, a US-versus-EU size-name map, a size-matrix method that keeps the SKU count in check, and the commercial questions to settle before a non-catalog width is scheduled. Market sizes are approximate references — confirm exact figures against the official spec sheet before ordering. The dimensions below come from the English brochure and the product data sheet. They are not a measurement performed by this website.
Why the wrong size costs more than any other mistake
Most other specification errors can be recovered in a later run. A sizing error cannot: once a frame is built at the wrong width, the options are rework, discounting, or disposal. For a buyer shipping at container scale, three costs stack up.
First, dead stock. A base that does not match the mattresses a market actually sells sits in the warehouse until it moves at a loss, or does not move. Second, returns and refused deliveries. A retailer who receives a base that does not sit correctly under its mattress will send it back, and return freight on a bulky base can erase the margin on several good orders. Third, container waste. Space used by a size that will not sell is space that could have carried one that would.
Confirm size before motor brand, fabric, remote, or packaging. Width and length belong at the top of the specification, in millimetres, agreed before the order is released.
Sizes shown in the product catalog
The English brochure prints Twin, Full, Double, Queen, and King beside the adjustable bed frames in this guide. Those words are size-family names, not one fixed width. The product data sheet records millimetre figures for specific models. A single 2000 × 900 mm line does not cover every frame below, and none of these figures is a statement that the factory builds only those widths. Custom or market sizes are confirmed on the RFQ and the sample.
| Model | Catalog description in this guide | Size names on the English brochure | Millimetres on the product data sheet |
|---|---|---|---|
| KD010-A2 | Disassembled electric bed frame in the AI bed frame series; lifting system separate from the mattress | Twin / Full / Double / Queen / King | 2000 × 900 mm catalog reference |
| KD011-A3 | Disassembled, with frame and enclosure | Twin / Full / Double / Queen / King | 2000 × 900 mm catalog reference |
| KD001-A3 | Adjustable bed frame | Twin / Full / Double / Queen / King | No millimetre catalog standard is stated in this guide |
The KD010-A2 belongs to the catalog AI bed frame series. The product name used here is disassembled electric bed frame, not the series title. Read 2000 × 900 mm as a catalog reference next to the Twin-through-King names, not as the only size on that model. The KD001-A3 is listed on the brochure with those same size names. This guide does not publish a millimetre size for it. A packing list is an order document, not a catalog standard.
Catalog dimensions for mattresses
Mattress reference dimensions differ by model. The series is not a three-width list. Twin, Full, Double, Queen, and King are printed beside the models that carry those names in the brochure. Where this guide does not state a size-family name, it is because the caption used here is the millimetre line only.
| Model | Catalog reference | Size names stated in this guide | Catalog note |
|---|---|---|---|
| KD004-B1 | 2000 × 900 × 280 mm; side height 250 mm | Twin / Full / Double / Queen / King | All-inclusive electric mattress; can be placed on the bed board; independent back and leg lift |
| KD003-B1 | 2000 × 1500 × 250 mm | Twin / Full / Double / Queen / King | Catalog height stated here is 250 mm |
Catalog angles, aging tests, and optional motors
Angles, aging-test figures, and motor brands below are catalog statements with a stated scope. They are not a single rule for every model, and they are not a test result issued by this website.
| Catalog figure | Where the brochure states it | How to use it |
|---|---|---|
| Backrest 0–60°, footrest 0–40° | AI / electric bed frame series page | Series page only. Not a range for every product. |
| Backrest 0–55°, leg rest 0–35° | Electric mattress pages, including KD004-B1 | The range on those pages. Not a range for every mattress. |
| Lifting system passed 10,000+ aging tests | AI bed frame series page | Catalog aging-test figure for that series page. |
| Over 10,000 lifting aging tests | Mattress pages, including KD004-B1 and KD003-B1 | Catalog aging-test figure for those pages. |
| Over 15,000 lifting aging tests | One individual mattress page only | Do not apply this figure to the rest of the catalog. |
| German OKIN or Haojiang | Optional motor configuration on the electric mattress series and the bed-frame models discussed here | Not fitted to every shipped unit. Lock the brand on the specification and the sample. |
A raised head incline may help some sleepers breathe more comfortably; this is a lifestyle ergonomics feature, not a substitute for medical care, and anyone with a serious condition should consult a doctor.
On the frame-series page, catalog construction is fabrics with high-density sponge, 15 mm or 18 mm eco-friendly multi-layer boards or high-strength honeycomb aluminum panels, and high-quality steel, with the lifting system designed separately from the mattress. Mattress configuration is customizable according to customer requirements. It is not one recipe for every model. Where the brochure describes mattress builds, knitted fabric with three-in-one quilting, natural latex, and high-density or floating sponge are configuration options, not a stack promised on every SKU. Independent pocket springs are listed on the KD003-B1 page.
The English brochure states: "Products comply with numerous export certifications, reaching a comprehensive coverage of relevant certifications in North America, Europe, Australia, Japan, Korea, Southeast Asia and other regions and countries." That is a coverage statement. This guide does not name a laboratory and does not turn the sentence into a certificate list. Ask for the document that applies to the model and the destination market.
For carton dimensions and container loading, request the figures for the order you are booking. Do not plan a shipment on assumed packaging numbers. This guide does not publish packing-list carton sizes.
US and EU size names: approximate market references
The same bed name means different dimensions in different markets. A buyer who orders "Queen" for the United States and "Queen" for Germany may be ordering two different products. Every figure in the middle column is an approximate market reference. None of them is a factory dimension. The catalog millimetres are in the tables above, and a market name still has to be translated into millimetres on the RFQ.
| Market size name | Approximate market reference | How to spec it |
|---|---|---|
| Twin XL (US) | Around 990 × 2030 mm | State the required millimetres. A 2000 × 900 mm catalog reference is a different width and a different length from this market reference. |
| Queen (US) | Nominal Queen width, length near 2000 mm | Specify width and length in millimetres and confirm them on the spec sheet. |
| King (US) | Nominal King width, length near 2000 mm | Specify millimetres. A 2000 × 1800 mm catalog width is not automatically this market name. |
| Single 90 (EU) | Around 90 cm wide | Near a 900 mm catalog width, including the KD004-B1 reference. Confirm millimetres. Near is not a match. |
| Double 140 (EU) | Around 140 cm wide | Some frames list a 1500 mm catalog width. Confirm the difference in writing before production. |
| Queen 160 (EU) | Around 160 cm wide | Between the 1500 mm and 1800 mm catalog widths on frames that list both. Agree the exact width. |
| King 180 (EU) | Around 180 cm wide | Near the 1800 mm catalog width on models that list 2000 × 1800 mm. Confirm length as well as width. |
Three rules keep the translation honest. First, specify in millimetres. Names are market labels. Millimetres are what the factory cuts. Second, confirm the mattress and the base together. Two products that share a market name can still miss each other by enough to show on the showroom floor. Third, check length as well as width. A Twin XL market reference around 2030 mm is not the same number as a 2000 mm catalog length. Measure the sample.
Building a size matrix without exploding the SKU count
A size matrix is the list of widths you will actually stock, crossed with the mattress and finish options each width carries. Every width multiplies across everything else in the range. Without the matrix, a program collects slow SKUs instead of a range that sells through.
The count is widths × mattress pairings per width × finish options per pairing. The worked example below uses 900 mm, 1500 mm, and 1800 mm because those catalog widths appear on several frames in the tables above. They are not a closed list of what can be built. In the example, each of the three widths has two mattress pairings and two finishes: 3 × 2 × 2 = 12 SKUs. Add one further width with the same pairings and finishes: 4 × 2 × 2 = 16 SKUs. If that further width also needs its own mattress thickness, its pairing count rises from two to three, and the total becomes 3 × 2 × 2 + 1 × 3 × 2 = 18 SKUs.
Width is the expensive axis to add, because each width brings its own mattress, packaging, and spares logic. Start from the market, not from a wish to carry every name. List the sizes retailers request, rank them by volume, and cut the tail.
Build the matrix in three tiers. Tier one is the core: one or two widths that cover most orders, chosen from catalog dimensions you have confirmed for that model. Tier two is growth: one additional catalog width, added only when a retailer commits volume. Tier three is a width that is not a catalog dimension for that model. Specify it only against a confirmed order, and ask whether it needs a new setup. Review the matrix every season and retire the slowest width.
Where a platform is disassembled, with the lifting system separate from the mattress, the size names printed for that model can be discussed on one platform. The KD010-A2 is that case. The flat-pack adjustable bed base design guide explains how a separate lifting system and mattress can support container-conscious shipping. The millimetres on the purchase order still have to be the millimetres that were confirmed.
MOQ and tooling: confirm the commercial minimum first
A non-catalog width is a commercial question, not only a cutting question. A width already shown for that model may run on an existing setup. A width that is not on the catalog dimension may need a different jig or carton. The sources used for this guide do not state a minimum order quantity. Do not assume one.
Ask three things before the size list is frozen. Does the width run on an existing setup, or does it need new tooling? What quantity does the factory require for that width? Does ordering it together with a catalog width on the same platform change the commercial minimum? The MOQ versus tooling cost guide for furniture startups sets out how to structure a first order so tooling does not swallow the margin.
Agree the size list before production is scheduled. A late change can mean a new setup, a new carton, and a delayed container. Put the agreed widths on the purchase order in millimetres, attach the signed specification, and request carton figures for that order rather than copying them from a previous shipment.
Pre-order checklist
Work through this list before the purchase order is signed, and keep the signed copy.
- Confirm width and length, in millimetres, for the frame, the mattress, and any headboard or surround, and confirm that the mattress width matches the frame. Use the catalog tables as the starting point, then confirm the order.
- Confirm the adjustment range for the model being bought. The frame-series page states backrest 0–60° and footrest 0–40°. The named mattress pages state backrest 0–55° and leg rest 0–35°. Neither range applies to every product.
- Confirm the motor brand. German OKIN or Haojiang is an optional catalog configuration. Lock the brand on the specification and the sample. Neither brand is a standard fit on every unit.
- Confirm materials for the model, using the catalog configuration above. Do not copy one layer list onto every SKU.
- Confirm certification for the destination market against the brochure coverage statement. Ask for the document, the model, and the validity. This guide does not name a laboratory.
- Confirm which aging-test figure applies. The frame-series page states 10,000+ aging tests. The listed mattress pages state over 10,000 lifting aging tests. Over 15,000 times is stated on one individual mattress page only. These are catalog figures, not a test run by this website.
- Confirm packaging by requesting carton dimensions for the order. This guide does not publish packing-list carton sizes.
- Confirm the size matrix: which widths are core, which are added with volume, and which sit outside the catalog dimension and need a commercial answer.
The English brochure company profile is the source for factory background in this guide. The business was founded in 2004 in Dongguan, Guangdong. It operates a 25,000 sqm modern factory with 150 skilled employees and serves over 100 global customers. The brochure describes nearly two decades of expertise in OEM/ODM manufacturing and positions the business as an OEM/ODM factory for adjustable beds and smart sleep. Since 2012 it has specialized in adjustable beds and AI sleep solutions, and it refers to patented technologies without stating a certificate count. The products are used in homes, elderly care, hotels, and engineering projects. None of that replaces the checklist. The order still has to state the right size.
Two paths: a specified size, or a catalog model
Once the matrix is settled, there are two ways to buy.
The first is OEM/ODM. Specify widths, finishes, and the options the program actually needs, and have the factory build to that specification. This suits a brand with a defined matrix and enough volume to carry a width that is not already a catalog dimension. Start from the spec sheet, submit the size list in millimetres, and ask for the commercial minimum and any tooling per width. The OEM/ODM partnership options describe how a custom program is structured.
The second is wholesale of a model already in the catalog, which avoids a new setup when the catalog dimension is the dimension you sell. The KD010-A2 is one starting point: Twin through King on the brochure, a 2000 × 900 mm catalog reference on the data sheet, and a lifting system separate from the mattress. The KD001-A3 is on the brochure as Twin through King. This guide does not give it a single millimetre size. Choose this path when the confirmed catalog size is the size the channel sells.
Either way, request a quote with the size matrix, the target quantities, and the destination market, and ask for the spec sheet. Send sizes in millimetres. Mark which widths are catalog dimensions and which are not. Let the factory confirm the commercial minimum, tooling, and carton specifications before you commit. Getting the size right is one careful specification. Getting it wrong is a container.
Cover image: AI-generated scene illustration; not a photograph of a specific product.
