On this page
A container of beds loaded with functions nobody asked for is a margin problem. Every added function is a component to source, a wire to route, a test step, a spare to stock, and a support question that outlives the shipment. The beds that move usually have a clear lift, a control the customer understands quickly, and one or two options the customer can actually perceive.
This guide discusses six optional configurations named in the English brochure: voice and app control, vibration massage, LED lights, USB ports, sleep monitoring, and intelligent anti-snoring. They are not the only options a program can discuss, and none is promised as standard on any model. Confirm the exact feature set in the quotation and on the golden sample, and request the official spec sheet.
Rank each one with three questions. Can the customer perceive the benefit in the showroom without a long explanation? Does it create a spares obligation that survives the container? Can the behaviour be shown on the golden sample? A feature that passes all three can support a higher retail position. A feature that passes none should not be priced as if it does. The ranking is a buying lens. It is not a factory score.
The direct answer: rank optional features by what the customer will pay for
The customer does not buy a feature list. They buy a bed that moves, a control that makes sense, and one or two additions that justify the step up. Vibration massage is first in this lens because the customer can feel it without an app and without a night of data. Sleep monitoring and intelligent anti-snoring sit in the middle: they can support a higher position only after the customer understands what is sensed and what the bed does next. USB ports and LED lights sit at the other end. They are useful and often expected. They rarely create the reason to pay more. Their job is to avoid losing a comparison. Voice and app control belong with the control decision, not with the price-driver decision, unless the market already lives on that platform.
The base specification still matters more than any option. On the English brochure AI and electric bed frame series page, the backrest adjusts 0–60° and the footrest 0–40°. On the electric mattress pages, including KD004-B1, the backrest adjusts 0–55° and the leg rest 0–35°. Those are the ranges printed on those pages. They are not a range for every model in the catalog.
The frame-series page states that the lifting system passed 10,000+ aging tests. The mattress pages, including KD004-B1 and KD003-B1, state over 10,000 lifting aging tests. One individual mattress page states over 15,000 times. These are catalog aging-test figures. They are not a result from this website, and the figure of over 15,000 times applies to that one page only.
Optional catalog motor configurations named for the mattress series and the bed-frame models in this guide are a German OKIN motor or a Haojiang motor. That is not a statement that either brand is fitted to every unit shipped. Lock the motor brand on the specification and on the sample.
Feature checklist for the quotation and the sample
Use the table from right to left. The last column is the question that keeps a feature from being a name without a behaviour. The same option can be a price conversation in one program and a checkbox in another.
| Optional configuration | Buyer lens | Spares implication | Confirm on the specification and the sample |
|---|---|---|---|
| Voice and app control | Worth a price conversation only where customers already use the platform | App accounts and platform support outlive the shipment | Which platforms are included, and whether the bed still operates from its remote without them |
| Vibration massage | Easiest option to demonstrate, because the customer can feel it | The massage motor and its control are service parts | What the sample does, how it is switched, and which spare replaces it |
| LED lights | Usually a checkbox; a dark showroom makes absence obvious, and a failure is more costly than absence | Light and driver are replaceable parts | Position, how it is switched, and the replacement part |
| USB ports | Usually a checkbox; a dead port on the first night reads as a faulty bed | Low-cost parts still need an ordering path | Count, placement, and whether charging is specified when the bed is not moving |
| Sleep monitoring | Possible step-up only when the data story is plain | Sensors, software, and app questions continue after delivery | What is sensed, how it is shown, which app is used, and whether the bed works with monitoring off |
| Intelligent anti-snoring | Possible step-up only with a clear account of what the bed does | Sensing and response need a defined support path | The behaviour on the sample. The brochure names the function and does not describe a detection method or a movement distance |
Vibration massage, and the functions named on the KD004-B1 page
Vibration massage earns the top of the buying lens because the demonstration is physical. The customer presses the control and feels the bed. That immediacy is also how the feature is demonstrated badly: if the sample does not match the description in the specification, the showroom story fails. Approve it only after the golden sample behaves as the specification describes, and record the spare that replaces the massage unit.
The KD004-B1 page of the English brochure lists these product functions: Deep Sleep Mode, Zero-Gravity Mode, One-key reset, Anti-Snoring Mode, Vibration Massage, Reading Mode, and Movie-Watching Mode. Treat the list as catalog functions on that page. It is not a standard set on every mattress. Confirm which of the names are in the configuration being ordered. Vibration massage appears both in that function list and in the optional-configuration list. Listing it twice on a quotation does not make it standard.
Sleep monitoring and intelligent anti-snoring
These two options are the easiest to oversell and the most likely to generate support calls. The perceived value is high. The after-sales exposure is high, because both depend on sensing and on software the customer will question the first time the result looks odd or the bed moves unexpectedly.
Sleep monitoring is its own optional function. Ask what is sensed, how it is shown, which app presents it, and whether the bed operates normally with monitoring switched off. Do not assume a particular control brand is the monitoring system. Sleepace is an optional control system, listed with a wired or wireless remote. It is not the only control system, and it is not automatically the path for sleep monitoring. Confirm the control and the monitoring function as two lines on the specification.
Intelligent anti-snoring is also an optional function, including the Anti-Snoring Mode named on the KD004-B1 page. The brochure names the function. It does not describe how snoring is detected, and it does not describe the movement the bed makes in response. Do not add a detection method or a movement that the specification for that configuration does not state. Test the response the specification does state, on the golden sample, and confirm that the user can adjust or switch off the function if the specification says so.
A head incline or a smart anti-snore function may help some people rest more comfortably, and sleep monitoring may help users notice patterns in their own rest. These are lifestyle ergonomics features, not medical treatment. They do not cure or treat any sleep condition, and anyone with a serious sleep or breathing concern should consult a doctor. Agree the support path, and the sensing parts you will stock, before you commit.
USB ports and LED lights
These two rarely decide which bed a customer chooses. Their absence can lose a comparison, and their failure can lose the customer. A charging port that does not work on the first night is read as a faulty bed. Specify them and test them on the golden sample.
For USB, confirm the number and the placement, and ask whether charging is specified when the bed is not moving. A port the customer cannot reach will not be used. A port that is easy to reach and poorly wired will fail first. The parts are low-cost. A low-cost part with no ordering path is still a service failure. Record the port specification on the golden sample so a later run cannot change it quietly.
LED lighting is a showroom tool as well as a night-time tool. Confirm the position and the switching method, whether that is the remote, an app, or a separate switch, because the switching method decides who can service it. The light and its driver are replaceable parts. Confirm they can be ordered for the model.
Optional controls, including the smart-bedroom page
Every option is reached through a control. The control decides whether the customer will use the feature. On the electric mattress optional-configuration list, the control choices include a wired or wireless remote, or Sleepace, plus voice control and app control. Sleepace is one optional control system. It is not "the" system, and it is not standard on every model.
The English brochure smart-bedroom page describes a further catalog integration. It integrates smart beds into IoT platforms, with personalized scenarios and sync with devices such as lights and motorized curtains. It describes multi-platform control through mobile apps, smart speakers, and smart displays, and tailored integration for major IoT platforms including Huawei, Xiaomi, Alibaba, Tuya, and Amazon. It describes app and miniprogram control with a built-in timer. On that page, Siri voice commands are supported for iPhone users. Read the page as an optional smart-bedroom integration, not as a control suite installed on every model. Ask what the built-in timer controls on the configuration you are buying.
Match the control to the option. Vibration massage, LED lights, and USB ports need a control the customer can find in the dark, which is often the remote. Sleep monitoring and intelligent anti-snoring need a place to show data and settings when a remote cannot. Voice control and the IoT platforms above can sit with either group, but only if that platform is the one the customer uses. A feature that depends on a platform the customer does not have is a feature that customer does not have.
Remotes, control boxes, and power supplies are among the parts most often needed after sale, and they are not interchangeable across platforms. Confirm the remote, the control-box version, and the pairing method for the configuration, and record them on the golden sample. Use the controls and accessories range as the list of paths to name. A feature with no named control has not been specified.
How to put the options on the RFQ and the golden sample
The RFQ is where a preference becomes a line on the order. A list of feature names, with no behaviour, no control, and no spare, specifies nothing. Give each included option its own line: what it does, which control operates it, which spare replaces it, and which test the golden sample must pass. For voice and app control, name the platforms. For vibration massage, describe the behaviour the sample must show. For USB and LED, state count, placement, and control. For sleep monitoring, state what is sensed, what is shown, and which app is used. For intelligent anti-snoring, state the behaviour the specification actually defines, not a mechanism this guide does not have. Ask, in writing, for the spare, the availability, and the support route. The adjustable bed after-sales parts guide sets out the spares questions in full.
The golden sample is where the line is proved. Test each included option the way the customer will use it. If the sample does not match the specification, stop and resolve the difference before production.
The English brochure company profile is the source for factory background here. The business was founded in 2004 in Dongguan, Guangdong. It operates a 25,000 sqm modern factory with 150 skilled employees and serves over 100 global customers. The brochure describes nearly two decades of expertise in OEM/ODM manufacturing and positions the business as an OEM/ODM factory for adjustable beds and smart sleep. Since 2012 it has specialized in adjustable beds and AI sleep solutions, and it refers to patented technologies without stating a certificate count. The products are used in homes, elderly care, hotels, and engineering projects. The brochure states: "Products comply with numerous export certifications, reaching a comprehensive coverage of relevant certifications in North America, Europe, Australia, Japan, Korea, Southeast Asia and other regions and countries." That sentence is regional coverage. It is not a named laboratory report. Ask for the document that matches the model and the market.
Frame-series materials on the brochure are fabrics with high-density sponge, 15 mm or 18 mm eco-friendly multi-layer boards or high-strength honeycomb aluminum panels, and high-quality steel. That is catalog configuration for the series page, not a bill of materials for every SKU. Mattress layers are customizable according to customer requirements and differ by model. Confirm the layer list on the specification for the model being ordered.
To build the option list around your own market, use OEM/ODM custom manufacturing and agree the options, the control, the spares, and the golden sample in writing before production. If the program needs a configuration already in the catalog, wholesale that model and confirm its feature set on the quotation and the sample. Either way, request a quote with the feature list, the control preference, and the spares requirements, and ask for the specification of the configuration you intend to buy. The beds that sell are rarely the ones with the longest list. They are the ones where every included option can be shown on the sample and supported after the sale.
Cover image: AI-generated scene illustration; not a photograph of a specific product.
