AI-generated lifestyle visualization of the KR001 upholstered smart adjustable bed in a refined bedroom
AI-generated lifestyle visualization based on the catalogue product reference. Confirm finish and configuration against the current model specification.
KR001 upholstered smart adjustable bed
Catalogue product view. Upholstery, size and configuration may vary by project.
SMART BEDS · OEM / ODM

KR001 Upholstered Smart Bed with KD001-B1 Mattress

A complete upholstered smart adjustable bed pairing the KR001 leather bed frame with the KD001-B1 electric mattress for premium private-label programs.

  • Leather upholstered frame + KD001-B1 electric mattress: head 0–55°, leg 0–35°
  • Smart-home integration: Huawei, Xiaomi, Alibaba, Tuya, Amazon
  • App miniprogram, wireless remote and voice control
  • Optional vibration massage, USB ports and LED lighting
  • Available Twin / Full / Double / Queen / King
Request specs & quote ↗
ModelKR001
CategorySmart beds
Technical specificationAvailable on request
Project reviewOptions confirmed for your market

Dimensions, motion functions, materials, controls and compliance documents are confirmed against the current model revision before order approval.

BUYER REVIEW CHECKLIST

Confirm the current KR001 specification

Website copy describes the product direction, not a universal engineering promise. Ask for the latest model-specific sheet and make the following items part of the approved quotation or sample record.

01

Bed configuration

Confirm frame, mattress and side configuration for the selected model revision.

02

Functions and controls

List the required motion, control and integration scope in the project brief.

03

Upholstery direction

Share target fabrics, colors, branding and room-positioning requirements.

04

Packing and evidence

Request current assembly, carton and market-document information.

What to include in your inquiry

Name the model, destination country, sales channel, required size and functions, expected quantity, branding needs and packaging constraints. KCAI will confirm which options and documents apply to the current revision before order approval.

SAME PRODUCT FAMILY

Related models

Compare other published models in this family before requesting a model sheet.

MADE FOR YOUR PROGRAM

Talk through the details.

Request the current specification sheet, available options and documentation for your target market.

Request KR001 specifications ↗