KR003 smart adjustable bed with motion mattress
KR003 smart adjustable bed with motion mattress
Catalogue product view. Upholstery, size and configuration may vary by project.
SMART BEDS · OEM / ODM

KR003 Smart Bed with KD002-B1 Motion Mattress

An upholstered smart adjustable bed pairing the KR003 frame with the KD002-B1 compact motion mattress for space-efficient and two-sided sleep programs.

  • Leather upholstered frame + KD002-B1 motion mattress: head 0–55°, leg 0–35°
  • Compact 280 mm mattress profile for versatile bedroom layouts
  • Smart-home integration: Huawei, Xiaomi, Alibaba, Tuya, Amazon
  • App, wireless remote and voice control
  • Available Twin / Full / Double / Queen / King
Request specs & quote ↗
ModelKR003
CategorySmart beds
Technical specificationAvailable on request
Project reviewOptions confirmed for your market

Dimensions, motion functions, materials, controls and compliance documents are confirmed against the current model revision before order approval.

BUYER REVIEW CHECKLIST

Confirm the current KR003 specification

Website copy describes the product direction, not a universal engineering promise. Ask for the latest model-specific sheet and make the following items part of the approved quotation or sample record.

01

Bed configuration

Confirm frame, mattress and side configuration for the selected model revision.

02

Functions and controls

List the required motion, control and integration scope in the project brief.

03

Upholstery direction

Share target fabrics, colors, branding and room-positioning requirements.

04

Packing and evidence

Request current assembly, carton and market-document information.

What to include in your inquiry

Name the model, destination country, sales channel, required size and functions, expected quantity, branding needs and packaging constraints. KCAI will confirm which options and documents apply to the current revision before order approval.

SAME PRODUCT FAMILY

Related models

Compare other published models in this family before requesting a model sheet.

MADE FOR YOUR PROGRAM

Talk through the details.

Request the current specification sheet, available options and documentation for your target market.

Request KR003 specifications ↗