On this page
The KD010-A2 adjustable bed frame gives mattress brands and importers a starting point for a disassemblable bed program. Its product record describes a lifting system separate from the mattress. For buyers, the first decision is the scope of the order: an adjustable mechanism, a complete frame, and a mattress are not necessarily the same purchase.
The cover shows an adjustable frame and mattress. The image's exact model revision and included components have not been verified against the quoted order; confirm both against the current product record.
What does the quotation include?
Ask each supplier to identify the frame, lifting mechanism, controller, power supply, legs, mattress and hardware as separate lines. An apparently lower quote may exclude parts another quote includes. For an OEM project, add the owner of the mattress-to-frame interface and any branding work to the scope.
The word “disassemblable” describes the frame format here. It does not establish a split-king layout or independent left-and-right mattress movement.
Choose a size before comparing minimum orders
The supplier's record identifies multiple size options. Ask for the minimum order for each exact dimension and configuration, together with the applicable drawing and carton arrangement. Compare the first order and replenishment quantities on the same basis.
These dimensions are metric references. Match the finished dimensions to the mattress and market requirements rather than assigning a US size name by assumption.
Turn the motion reference into a sample brief
Request the current drawing and supplier-approved specification for the exact size and revision, including finished dimensions, height, movement ranges and motor configuration. An older summary or photograph cannot establish those values for a new order.
A load figure without an identified configuration, loading method and result should not be treated as a verified dynamic rating. Motor count alone does not establish system capacity or the number of independently controlled zones.
Plan sample, production and freight together
Put the sample schedule, production lead time, starting event, approval milestones and requested ship date in the quotation so both parties plan against the same schedule.
For freight planning, request the size-specific carton dimensions, cartons per set and the loading arrangement for the selected container. A theoretical container calculation is not a loading test.
A size-to-order planning sheet
Use one row for each proposed SKU. Keep supplier reference values separate from your order requirements.
| Decision | Supplier reference or buyer input | Your project |
|---|---|---|
| Finished size and market | Buyer input | ______ |
| Minimum order for that size | Supplier quotation | ______ |
| Initial quantity and release schedule | Buyer input | ______ |
| Included frame, mattress and hardware | Quoted scope | ______ |
| Sample approval date and open issues | Buyer input | ______ |
| Carton revision and units per carton | Current packing sheet | ______ |
Compare the actual sample’s parts, cable routing, mattress retention and movement against the same drawing and quotation. The motor guide explains how to assess actuators and system load separately.
