A mixed-model container can align a shipment with a buyer's SKU plan, but carton cube alone is not a loading plan. Confirm the actual packed dimensions, weights, handling limits and route before committing quantities.
The IMO/ILO/UNECE CTU Code offers practical guidance for packing and securing cargo transport units. The shipper and packing team should apply the relevant requirements to the actual container and load.
Last updated:
Quick answer: build the loading worksheet
Calculate volume as length × width × height for each carton, then multiply by quantity. Treat the sum as an initial estimate: real utilization also depends on dimensions, stacking restrictions and safe weight distribution.
| Input | Record for each SKU | Decision it supports |
|---|---|---|
| Carton | Approved packed length, width, height and orientation | Volume and physical fit |
| Weight | Gross weight per carton and quantity | Payload and distribution |
| Handling | Stack limit, crush sensitivity and protection needs | Layering and securing plan |
| Order | SKU, model revision, quantity and destination labels | Receiving and reconciliation |
Confirm the physical loading plan
- Compare the worksheet with the actual container's payload and internal dimensions.
- Have the packing team plan weight distribution, blocking, bracing and access for unloading.
- Check whether furniture, upholstery and electronics need separate protection or orientation.
- Photograph the approved loading sequence and reconcile carton counts and identifiers to the packing list.
- Revise the mix if safe securing or handling cannot be achieved, even when the volume calculation appears to fit.
Verify the proposed KCAI mix
Do not assume particular KCAI models are flat-pack, foldable or eligible for one mixed order. Request current packed specifications, minimum quantities by SKU, compatibility and a proposed loading plan for the actual order.
Frequently asked questions
Can I tell whether the container will be full from carton volume?+
Volume is a first estimate only. Verify the physical layout, stacking, weight distribution, securing and container limits with the packing team.
Can frames, mattresses and recliners share a container?+
Possibly, if the actual products and packaging can be loaded and secured safely and the commercial order permits the mix. Request a model-specific loading plan.
What information is needed for a mixed-model loading plan?+
For each SKU, request the approved carton dimensions, gross weight, quantity, orientation, stacking limits and destination labels. The packing team can use these inputs to assess physical fit, payload, weight distribution, securing and unloading.
Related
Request a Mixed-Load Plan
Get a specification and quote for your adjustable bed program.