A factory tour shows equipment; an audit tests whether a named order can be traced from approved specification through production, checks and release. Set the exact model, configuration and audit scope before the visit.
A live video tour can be useful for screening, but the buyer still needs records and, where justified, an independent on-site inspection. Neither format alone proves every shipment meets the agreed specification.
Last updated:
Quick answer: follow one recent production lot
Request a lot selected during the audit where practical. Match dates, model identifiers and quantities across records; a certificate or station photograph alone is not evidence that the ordered units passed.
| Audit step | Ask to see | What to compare |
|---|---|---|
| Incoming parts | Supplier, part revision and receiving record | Approved bill of materials and ordered variant |
| Assembly | Work instruction, tooling and in-process checks | Current model revision and recorded deviations |
| Functional test | Test method, acceptance limits and lot results | Whether the method covers the ordered functions |
| Nonconformity | Recent defect, rework and retest record | Traceability and closure of the corrective action |
| Release | Final inspection and carton identifiers | Purchase order, approved sample and shipment list |
Record the gaps and required follow-up
- Identify which activities are performed on site, outsourced or only demonstrated on a sample.
- Ask who approves changed components and how the change reaches work instructions and test plans.
- Check calibration and maintenance records for equipment used to accept product.
- Separate a process-system certificate from product-specific test evidence.
- Assign each finding an owner, evidence request and close date before supplier approval.
Verify KCAI claims against current records
A buyer can request a live or on-site review of the proposed KCAI production route, but this page does not establish that every ordered model receives a particular jig, 100% functional test or named certification. Ask for the applicable facility, model-specific process map, sample records and permitted audit access in the quotation stage.
Frequently asked questions
Can I audit a factory remotely?+
A live walkthrough and shared records can screen a supplier. Decide whether an on-site or third-party audit is needed based on product risk, order size and the gaps the remote review could not resolve.
Is one test station enough to prove a quality system?+
No. Verify the model-specific test method, acceptance limits, dated results, nonconformity handling and traceability to the shipment.
What records should an adjustable bed factory audit trace?+
Select a relevant model and lot, then compare incoming part identities, assembly instructions, functional checks, nonconformity records and final inspection with the approved specification and shipment identifiers. Record which steps were observed and which rely on supplied documents.