A purchase order that says only “100 adjustable beds, as quoted” leaves important product and release questions unanswered. Which drawing revision was quoted? Does each set include the same remote, legs and mattress retainer as the approved sample? Which carton and manual files will ship? A buyer can answer those questions in a short, controlled annex before production starts.
This adjustable bed OEM purchase order checklist is for brand and importer teams moving from an accepted quotation to a production commitment. Use it alongside the RFQ checklist and quote comparison guide. Those documents establish what was requested and priced; this one records what the two parties have actually agreed to build and release.

AI-generated editorial concept. The bed, paperwork and carton are generic; the image is not an approved KCAI model, order record or packing specification.
The one-page PO annex
Attach a dated annex to the PO. Give every file a revision identifier and name one owner on each side who can resolve an inconsistency. A useful annex has these fields:
| Field | Buyer records | Supplier confirms |
|---|---|---|
| Order identity | PO number, issue date, buyer and destination | Written acceptance and any exception |
| Product baseline | Model, size, color, finish, market variant and drawing revision | Matching bill of materials and production reference |
| Included set | Base, control, power supply, legs, retainers, fasteners and optional parts | Exact quantity and part revision per set |
| Approval reference | Identified sample and sign-off record | Location of the controlled reference and agreed deviations |
| Customer-facing files | Carton artwork, labels, manual, inserts and language | Final file versions used for production |
| Quantity | Units by SKU, overage or shortage rule if agreed | Production quantity and carton count by SKU |
| Evidence and release | Inspection plan, required documents and release contact | Evidence to send before shipment and exceptions requiring approval |
Do not copy a specification from a different model into this annex. Ask for the current model revision and configuration-specific document pack. The golden sample guide explains how to identify the physical reference.
Lock the set, not just the bed frame
An adjustable base can be physically correct yet commercially incomplete. A missing cable, wrong remote revision or mismatched leg set can stop installation. For each sellable SKU, list every component that reaches the customer and every item supplied separately for service. State whether the mattress is included or excluded; the answer should never depend on an image in a quotation.
Specify the power and control variant for the destination market. If a supplier offers an alternative component, require a written comparison of the affected interfaces: electrical connection, mounting, function, user instructions, spare-part identity and any applicable document scope. The buyer then approves or rejects the alternative before it enters the build.
Name the production hold points
A PO can be accepted before every file is final, but each open decision needs a hold point. For example, carton artwork can have an owner and due date, with printing held until the buyer approves the final proof. A material substitution can require a sample and an updated part list before assembly. “To be confirmed” by itself is not a release instruction.
Use a simple decision log:
| Open item | Affected SKU or batch | Owner | Evidence needed | Release decision and date |
|---|---|---|---|---|
| Example: final manual artwork | Specify the affected market variant | Buyer marketing | Approved PDF revision | Hold printing until signed off |
| Example: alternate remote | Specify the affected control package | Buyer engineering | Compatibility review and sample | Hold substitution until approved |
These are examples of fields, not KCAI order terms. Your own contract determines the acceptance and change procedure. If a project includes a first production run, use the pilot-order checklist to define its evidence and release decision.
Connect packing and shipment release to the same revision
The approved product baseline should point to the exact packaging revision. Request the finished carton dimensions and weights only after the packing configuration is fixed; use those measurements for freight planning. Record the carton count per set, carton-to-SKU mapping, printed marks, included-part check and any agreed packing or handling limit. An unapproved carton change can affect freight cost, damage risk and the receiving process even if the bed itself is unchanged.
Before shipment, ask for the agreed inspection record, exception list, final packing list and carton data by SKU. Confirm who may accept a deviation and whether acceptance is limited to one identified batch. A shipment should not be released merely because a production photo looks satisfactory.
Send a clear order-confirmation request
Send the supplier the PO and annex as one versioned pack. Ask for a response that either accepts every listed revision or marks exceptions line by line. Keep the accepted version, the approval sample reference and any later change notices together. That makes the first order easier to receive and the next order easier to repeat.
For a KCAI OEM/ODM discussion, share your target market, product configuration, expected order mix and any existing specification or sample. Request a model-specific confirmation pack before treating a quotation as production-ready.