product technology

YJ001-A01 Adjustable Leisure Chair: OEM Buyer Guide

Review leisure chair configuration, upholstery, sample dimensions and packing records for an OEM furniture program.

4 min readBy KCAI Editorial Team
AI-generated generic leisure chair showroom and upholstery review scene
AI-generated editorial illustration. It is not a photograph of a specific KCAI product, component, facility or test.
On this page

An adjustable leisure chair can be a meaningful addition to a furniture assortment when the buyer can describe the exact model, controls, upholstery and delivery format. The separate YJ001-A01 shipment record provides a starting reference for an OEM discussion, but A01 is not listed as a model in the current public product catalogue. Confirm availability and the relationship to the current chair range before using this code in an RFQ or listing. The record does not establish that a similarly named catalogue chair is the same submodel or that every option is included.

AI-generated generic leisure-chair showroom and upholstery review scene

AI-generated editorial concept. The generic chair is not a photograph or confirmed depiction of YJ001-A01.

Define the A01 configuration and intended setting

Start with the destination market, intended sales channel, room setting and target user instructions. Put the model code and proposed finish on the same supplier brief as the requested controls, power requirements, packaging and service documents. The adjustable recliner program page provides a broader discussion starting point.

The catalogue uses series names that have not yet been mapped conclusively to the A01 shipment code. Ask for a current model-specific photograph and specification before using an image or series description in a retail listing.

Review the motor reference with the actual motion map

The supplied worksheet includes a motor configuration reference for A01 that requires model-level confirmation. A motor count does not establish which sections move independently or which controller input operates them. On the proposed sample, record each input and resulting movement; pair the observation with the actuator and control-box identifiers listed in the quotation.

The source contains different leg-angle references, and their relationship to the exact submodel is not established. Use a model-specific movement drawing and sample measurements before publishing a range. Optional massage, voice or USB functions should appear in a retail specification only when included in the ordered configuration.

Record the chair envelope in comparable positions

A shipment record is labelled YJ001-A01, but its relationship to the current catalogue submodel requires confirmation. Treat any recorded dimension as a batch reference, not a guarantee for every finish or future revision. Measure the proposed sample in each intended position from a fixed floor and wall reference; record the chair's furthest moving point as well as its footprint.

MeasurementPosition / datumSample resultDrawing or photo
Width and length__________________
Overall height__________________
Space behind moving sections__________________
Cable route and floor clearance__________________

The goal is an installation envelope for the actual sample, not an unverified promise that the chair fits every room.

For the installation-space method, use the power recliner wall-clearance guide. Its measuring workflow is a starting point; confirm the actual travel and clearance of the offered chair sample.

Approve upholstery and contact surfaces

The supplied records describe an upholstery finish for a labelled batch. Record the approved material, color, seams and contact surfaces for the order, along with the applicable care instructions. Other materials mentioned at series level should be treated as options to discuss, not as proof that A01 is supplied in a particular leather grade.

Compare the approved swatch with the assembled sample under the intended display lighting. Photograph seams, edges and any visible variation; record an acceptance decision before the marketing images are prepared.

Separate the shipment carton from the planning carton

The shipment record and OEM planning entry contain different carton dimensions. They should not be combined into one standard specification: confirm the product revision, packing materials, weight and units per carton for the intended order.

Ask for the actual packed-parts list, safe handling instructions and the service process before finalizing a retail delivery promise. A proposed container quantity is a planning figure until it is tied to the selected carton and loading arrangement.

Chair sample acceptance card

Review itemRecord for this sampleDecision / owner
Model, revision and sample ID____________
Finish and approved swatch____________
Controller input and observed movement____________
Position, datum and measured envelope____________
Cable route and service instructions____________
Carton version and unpacked components____________
Photos, defects and follow-up____________

Send your chair configuration and upholstery brief. Ask whether the A01 shipment reference corresponds to an available current model before naming it in a purchase order.

Buyer FAQ: Frequently Asked Questions

Direct answers to common sourcing, specification and approval questions about this topic.

Does a motor count define the number of independent control zones?+

No. The controller, wiring and observed movement map for the quoted sample determine the functions available to the user.

Are the recorded dimensions the standard size for every A01?+

They come from one labelled shipment record. Use the drawing and sample for the version being ordered.

Can a catalogue series image be used for the A01 product listing?+

Only after the supplier confirms that the image matches the A01 submodel and selected configuration and authorizes its use.

Discuss your adjustable-bed requirements

Request current product information and a quotation for your project.