ELECTRIC MATTRESS · OEM / ODM

KD004-B3 Adjustable Mattress

An adjustable mattress with a low-profile build and independent head and leg lift for OEM programs requiring a slim, flexible motion layer.

  • Independent head and leg section lift
  • Low-profile 280 mm build for versatile installation
  • High-quality steel inner frame; 10,000+ lift aging tests passed
  • Size: 2000 × 1800 × 280 mm; Twin–King available
Request specs & quote ↗
ModelKD004-B3
CategoryElectric Mattress
Technical specificationAvailable on request
Project reviewOptions confirmed for your market

Dimensions, motion functions, materials, controls and compliance documents are confirmed against the current model revision before order approval.

BUYER REVIEW CHECKLIST

Confirm the current KD004-B3 specification

Website copy describes the product direction, not a universal engineering promise. Ask for the latest model-specific sheet and make the following items part of the approved quotation or sample record.

01

Layer construction

Confirm the current material stack and comfort brief for the destination market.

02

Motion interface

Review articulation, controls and compatibility with the intended bed system.

03

Size and cover

Specify the finished size, cover requirements and branding direction.

04

Packing and evidence

Request model-specific packing data and applicable supporting documents.

What to include in your inquiry

Name the model, destination country, sales channel, required size and functions, expected quantity, branding needs and packaging constraints. KCAI will confirm which options and documents apply to the current revision before order approval.

MADE FOR YOUR PROGRAM

Talk through the details.

Request the current specification sheet, available options and documentation for your target market.

Request KD004-B3 specifications ↗